Xframe conservatory system
 
Home
Xframe System
Conservatories
Online Quotes
Installation
Offers
Downloads
Our Customers
Contact Us
News
 

Installation

DAY 1
Layout Steel base in the required location. Fix together and level using supplied height adjustable legs.
Slot floorblocks into place, fixing in the required locations.

DAY 2
Place the dwarf wall section around the perimeter of the base and fix through the pre-drilled holes.
Fit and seal any dwarf wall joints, fix remaining brick slips and point as per fitting instructions.

DAY 3
Place framing of conservatory on wall as per conservatory suppliers instruction.
Fit glazing into framework and seal joints as per conservatory suppliers instructions.

XFRAME provides a full installation service should you require.
Please call us on 01670 707200

 

NAME:
EMAIL:
TELEPHONE:
POSTCODE:

 
 
Designed, hosted and maintained by Widescope Web Design, Complete Internet Solutions | Acier Architique